| PROJECT TYPE Chiller Replacement |
CLIENT A Critical Site, Crawley |
COMPLETED 2024 (1-day turnaround) |
This Crawley site houses critical infrastructure equipment that is vital for business continuity, so cooling cannot be out of action for long. When the existing chiller developed a fault, the client needed it replaced with the shortest possible downtime.
The key to this project was planning. Every stage was worked out in advance so the swap could be completed in a single day.
On the day, the old faulty chiller was decommissioned and removed, and the new unit was lifted into position by crane. It was then connected and commissioned on site.
The new chiller was installed, commissioned and fully handed over to the client within 10 hours, keeping disruption to a critical site to a minimum.