A Critical Site, Crawley

PROJECT TYPE
Chiller Replacement
CLIENT
A Critical Site, Crawley
COMPLETED
2024 (1-day turnaround)

Project overview

This Crawley site houses critical infrastructure equipment that is vital for business continuity, so cooling cannot be out of action for long. When the existing chiller developed a fault, the client needed it replaced with the shortest possible downtime.

What we did

The key to this project was planning. Every stage was worked out in advance so the swap could be completed in a single day.

On the day, the old faulty chiller was decommissioned and removed, and the new unit was lifted into position by crane. It was then connected and commissioned on site.

The result

The new chiller was installed, commissioned and fully handed over to the client within 10 hours, keeping disruption to a critical site to a minimum.

New chiller being craned into position on a critical site in Sussex Chilled water pressurisation unit and expansion vessel in the plant room

Need a chiller replaced with minimal downtime? See our chiller services or call 01273 581000.